American Geophysical Union, Fall Meeting 2008, abstract #V41B-2081 The third leg of the 2008 Chinese DY115-20 expedition on board R/V Dayangyihao has successfully discovered, for the first time, active hydrothermal vent fields on the fast-spreading Southern East Pacific Rise (SEPR) near the equator. This expedition follows the work of a 2005 expedition by R/V Dayangyihao, during which water column turbidity anomalies were measured in the region. The newly discovered vent fields are located along a 22-km-long ridge segment of the SEPR at 102.655°W/2.22°S, 102.646°W/2.152°S, 102.619°W/2.078°S, and 102.62°W/2.02°S, respectively, as well as on an off-axial volcano near 102.456°W/1.369°S. A significant portion of the activity appears to be concentrated along the edges of a seafloor fissure system. Furthermore, water column turbidity anomalies were observed over off-axis volcanoes near 102.827°W/2.084°S and 102.58°W/2.019°S. Video footage of the vent fields and water column turbidity, temperature, and methane anomalies were recorded by a deep-towed integrated system consisting of video, still camera, CTD, and ADCP, and MAPR and METS sensors. Two active hydrothermal fields at 2.217°S and 2.023°S were then extensively photographed and surveyed using the autonomous underwater vehicle ABE of the Woods Hole Oceanographic Institution (WHOI). Four samples of hydrothermal chimneys were successfully obtained by a TV-guided grab in three locations, showing evidence of high-temperature hydrothermal venting.
DY115-20 Leg 3
              PI Country: 
                    China        
              PI Country: 
                    USA        
              PIs: 
                    Tao, C.; Lin, J.; Wu, G.; German, C.; Yoerger, D.        
              Institution: 
                    Second Institute of Oceanography, SOA; WHOI        
              Funding: 
                    COMRA        
              Ocean: 
                    S. Pacific        
              リージョン: 
                    S EPR        
              年: 
                    2008        
              Start Date: 
                    13-Aug-08        
              End Date: 
                    10-Sep-08        
              Ship: 
                    R/V DayangYihao        
              Equipment: 
                    AUV ABE        




 
            